Project Summary
Key challenges involved the complete disassembly and removal of the existing AHUs from confined Plant Rooms through standard-size doorways. The new AHUs were similarly disassembled off-site, transported in sections, and reassembled in place.
Works also included the installation of new electrical power supplies, integration with the Building Management System (BMS), replacement of temperature and CO₂ sensors, connection to existing chilled water pipework, and comprehensive testing and commissioning. Final water and air balancing was completed for Levels 3 and 4 to ensure optimal system performance.