Glennie Learn to Swim Pool
Alpine Refrigeration was engaged by Northbuild Construction to provide specialist installation works for mechanical air conditioning and ventilation services to the new Learn to Swim Pool at The Glennie School.
PROJECT LENGTH
5 months
PROJECT VALUE
$79,060
PROJECT SECTOR
Education
Project Summary
The project called for Alpine’s technical expertise to supply, deliver, install, test, commission and service the mechanical systems.
- The new pool required specialised energy recovery ventilation mechanical equipment that maintains controlled conditions throughout the new building.
- The design installed by the Alpine Team was an Armcor ERV Package unit which distributed conditioned air to the pool area.
- The system was controlled by Innotech Controllers with an individual wall controller providing the client with individual control over unit along with scheduling for after-hours economy modes.