Project Summary
The project called for Alpine’s flexible approach to heritage listed building refurbishments of a complex and critical nature. By working closely with Northbuild, the outcome was an energy efficient, state-of-the-art air conditioning system complementing the architectural features of the historic building.
The building structure and cavities posed significant challenges for the Alpine ductwork team along with enabling chilled water piping system, but intense internal design and installation skills provided the results as needed.
The mechanical equipment was designed and installed to provide both specific comfort, acoustic and environmental conditions. The design installed by Alpine called for a Daikin Chiller and chilled water system with multiple large indoor fan coil units with zone control and incorporated high efficiency filtration for indoor air quality control. Special low velocity Halton grilles were installed in the main auditorium areas to allow for sufficient volumes of conditioned air infiltrate the areas while maintaining comfort conditions.
The design was predominantly a chilled water system which conditioned the main hall areas while Mitsubishi stand-alone units conditioned the kitchen, office and comms room. All systems are controlled by a BMS system installed by others.