PROJECT LENGTH
PROJECT VALUE
PROJECT SECTOR
Project Summary
Alpine was contracted to supply, deliver, install, test, commission and service the mechanical systems and associated works at the facility.
Very limited spaces were available for the installation of the mechanical equipment on this project. Installation was undertaken successfully through the skills and expertise of the Alpine team, coupled with close liaising and effective communication with the builder.
The engineering design intent was to maintain controlled conditions throughout all areas of the building via chilled and heated water air conditioning systems. The design installed by Alpine consisted predominantly of Oceania chilled water equipment which distributed conditioned air to all rooms and open learning areas. Outside air was distributed throughout, via the air conditioning ducted systems. All systems are controlled by the USQ BMS system which was installed
by Schneider Electric.