Warwick Church of Christ
Alpine Refrigeration was engaged by Total Construction to provide specialist installation works for mechanical air conditioning and ventilation services to an aged care facility in Warwick.
A black and white clock with an arrow pointing to the right.

PROJECT LENGTH

14 months
A black and white drawing of a dollar sign in a circle.

PROJECT VALUE

$2,800,000
Project Sector Icon

PROJECT SECTOR

Health

Project Summary

The project called for Alpine’s technical expertise to supply, deliver, install, test, commission and service the mechanical systems and associated works at the facility.

  • The facility required critical planning due to both the design and quantity of mechanical equipment that maintained control conditions throughout all areas of the building.
  • The design installed by the Alpine Team was predominantly Mitsubishi City Multi systems which distributed conditioned air to all rooms and offices. 
  • All systems are controlled by Mitsubishi Central Controllers and Sub-Controllers providing the client with individual control over all individual air conditioning systems.
  • Kitchen exhaust hoods including mechanical extraction equipment were also installed on the facility.